| Statement of
Mr. David Warren
Director, Defense Management Issues
U.S. General Accounting Office
I am pleased to be here today to present our observations, based on past
and ongoing work, on the Department of Defense's (DOD) latest reform initiatives. These
initiatives are described in the Defense Reform Initiative (DRI) Report, which was issued
by DOD in November 1997. DOD is attempting to bring about a revolution in its business and
support operations by identifying and adopting the best business practices from the
private sector. Specifically, it is proposing to:
-- reengineer many of its business processes;
-- consolidate and reorganize DOD's headquarters elements and defense agencies,
including the Office of the Secretary of Defense;
-- increase the use of the Office of Management and Budget (OMB) A-76 process to compete
DOD's commercial activities; and
-- conduct two additional rounds of base realignment and closures (BRAC).
These actions are intended to reduce the cost of DOD's business and support activities so
that operations and maintenance funds can be freed up to support weapons modernization and
readiness needs.
In announcing this hearing, you expressed concern about DOD's record of executing programs
designed to achieve infrastructure savings and the potential impact on readiness accounts
if current reform initiatives falter in execution. In that context, my comments today will
focus on the (1) risks associated with reducing budgets before savings are achieved, (2)
challenges associated with implementing DOD's various business process reengineering
initiatives, (3) opportunities to capitalize on consolidation and regionalization
opportunities, and (4) underlying management problems that need to be addressed in
implementing the reform initiatives. Before discussing my specific observations, I would
like to briefly summarize my key points.
RESULTS IN BRIEF
The task facing DOD as it tries to implement reform initiatives is not easy. However, it
is one we strongly support. Our work continues to show that significant opportunities
remain to further streamline operations, consolidate functions, eliminate duplication of
effort, and improve efficiency in DOD's business activities. These opportunities must be
fully embraced if DOD is to achieve the level of savings it needs to meet other priorities
such as weapon system modernization and readiness within expected budgets. The following
are some key points we believe the Congress and DOD should take into consideration as DOD
assesses DRI implementation and expected results.
First, DOD's plans to reduce out-year budgets before the magnitude of savings are clearly
known is not without risk. This risk is that operating units and field commanders will not
have sufficient funds to meet their readiness needs. Past reform initiatives, like the
Defense Management Review (DMR) of the early 1990s, started with much the same hope and
promise as the DRI. However, for a number of reasons, which I describe below, they were
not able to sustain themselves and fully achieve hoped for results. In many cases, DOD
reduced its operations and maintenance budgets up-front, in anticipation that the savings
would be realized. When these savings did not materialize as quickly or to the extent
expected, two things happened. Either money was deferred from other parts of the defense
budget to pay for shortfalls in operations and maintenance accounts or support functions
went underfunded. We see the same type of risk with the DRI. For example, most savings
from the DRI are expected to come from future competitions using OMB's A-76 process and
from two additional BRAC rounds. In addition DOD is once again proposing to reduce
operations and maintenance funds in out-years budgets to capture the expected savings.
Yet, our past work shows that A-76 competitions and BRAC rounds have produced savings, but
they have not been as great or materialized as quickly at DOD initially estimated.
Second, many of the DRI business process reengineering initiatives must overcome
significant challenges if they are to be implemented in a timely, efficient, and effective
manner. While DOD expects these initiatives to save an unspecified amount of money, it is
also counting on them to bring world-class business processes to DOD and improve the
quality of service provided to defense customers. Our overall impression is that the
initiatives have the potential to save significant amounts of money and improve the
quality of service they provide. However, in some cases, DOD either faces significant
implementation challenges or is not thinking broadly enough in implementing the reform.
For example, DOD has made significant progress in implementing the prime vendor program
for medical and food supplies, but these account for only two percent of the 4 million
consumable items managed by the Defense Logistics Agency (DLA). Implementing this program
for hardware items, which make up 97 percent of DLA's consumable items, has not been as
easy. Internal resistance to change and external resistance from defense customers
unfamiliar with the concept are some of the barriers that must be overcome if this
initiative is to succeed.
Third, significant opportunities exist to achieve savings from consolidating,
restructuring, and regionalizing initiatives. However, our past work on these initiatives
shows that DOD has not been able to fully capitalize on the potential offered by such
consolidations. For example, we recently reported on the Navy's efforts to streamline and
consolidate its maintenance programs for fleet ships and aircraft. While we found that the
Navy had made substantial progress, the consolidations and related savings had not
materialized as expected. Because the Navy had already made reductions to spending plans
in anticipation of these savings, we reported that the overall material readiness of ships
and aircraft could be negatively affected. For example, while the Navy had been able to
absorb the reductions in the short term by fixing specific problems rather than performing
scheduled depot-level overhauls, Navy officials were concerned about the long-term impacts
of this approach.
Lastly, achieving success in the DRIs requires DOD to address the underlying causes of its
systemic management problems, which we have previously reported. These causes include (1)
cultural barriers and service parochialism that limit opportunities for change; (2) the
lack of incentives for seeking and implementing change; (3) the lack of comprehensive and
reliable management data for making decisions and measuring program costs and performance;
(4) the lack of clear, results-oriented goals and performance measures, in some cases; and
(5) inconsistent management accountability and follow through. To address these problems,
DOD needs to ensure that implementation plans for each level of the organization include
goals, performance measures, and time frames for completing corrective actions; identify
organizations and individuals accountable for accomplishing specific goals; and fully
comply with legislative requirements of the Chief Financial Officers Act, the Government
Performance and Results Act, the Paperwork Reduction Act, and the Clinger-Cohen Act.
BACKGROUND
DOD's latest efforts to reform operations and processes were spelled out in the
Secretary's DRI Report, which was released on November 10, 1997. The report was the result
of recommendations made in the Report of the Quadrennial Defense Review (QDR) The QDR
report noted that while DOD had reduced active duty personnel by 32 percent between 1989
and 1997, it had only reduced the number of people performing infrastructure functions by
28 percent. The report called for significant additional reductions in military and
civilian personnel. Reductions called for by the QDR and other DOD planning efforts would
have the effect of reducing military and DOD civilian personnel end strength levels by an
additional 59,000 and 130,000 positions, respectively, below their fiscal year 1998
levels.
The Secretary noted in his DRI report that the military forces and the defense industry
have made great strides in adjusting to a dynamic new world but much of the rest of the
defense establishment remains "frozen in Cold War structures and practices." For
this reason, he pointed out that there is a real danger that the planned revolution in
military affairs will quickly "outrun" the ability of logistics, personnel,
medical, and other systems to support it. Accordingly, the Secretary called for what has
been characterized as a revolution in business affairs and included in the DRI report, a
number of reengineering initiatives aimed at adopting modern business practices and
attempting to achieve world- class standards of performance. These initiatives include
DOD's efforts to
-- reduce the administrative cost and burden of approving temporary duty travel, filing
for reimbursement, and receiving payment;
-- expand its use of prime vendors to buy, store, and distribute DOD's consumable
inventories;
-- develop a total asset visibility capability so that it can better manage its inventory;
-- change its household goods transportation process to provide better, cheaper service
for the hundreds of thousands of military and civilian personnel that are required to move
each year; and
-- make its contracting and contractor payment processes paper-free.
The DRI report also lays out plans to reduce excess support costs by consolidating support
agencies to achieve economies of scale. In addition, it calls for large numbers of A-76
outsourcing competitions and two additional rounds of BRAC.
An important element of this reform initiative is that the Secretary has established the
Defense Management Council to, in effect, serve as DOD's internal board of directors. The
primary mission of this Council, which is chaired by the Deputy Secretary of Defense and
includes many of DOD's senior managers, is to monitor progress of the management reforms,
seek new solutions and reengineering opportunities, and assist the Secretary in overseeing
the activities of the military departments and defense agencies. This Council, if it
operates as described, should bring a heightened awareness and sense of importance to
DOD's management reforms.
RISK IN REDUCING BUDGET BEFORE SAVINGS ARE ACHIEVED
DOD is planning to reduce out-year operations and maintenance budgets in anticipation of
the savings that will accrue from the DRIs. Just about all the anticipated savings
identified in the DRI report, however, are linked to future competitions under OMB
Circular A-76 and two additional rounds of base closures. Our past work has shown that
A-76 competitions and base closures produced savings, but they may not have been as great
or materialized as quickly as DOD initially estimated. Consequently, reducing out- year
budgets before savings are more clearly known increases the risk that operating units and
field commanders will not have sufficient funds to meet their readiness needs. Although
DOD is currently not targeting savings from business process reengineering initiatives for
similar out-year budget reductions, DOD will still need efficiencies from these
initiatives to meet its planned personnel reductions targets.
Magnitude of BRAC and OMB-76 Savings Estimates In Out-Year Budgets Is Questionable
Most savings from DRIs are expected from additional rounds of BRAC and public-private
competitions under OMB A-76. The Secretary of Defense recently submitted a legislative
proposal to the Congress requesting authority for two additional BRAC rounds, one in 2001
and another in 2005. While DOD estimates that these two rounds will require an estimated
up-front investment of $12 billion, it believes they will save about $14.5 billion during
the base closure implementation period and about $1.4 billion each year after the closures
are completed. Our work has shown that savings from prior BRAC rounds are expected to be
substantial. However, because DOD's up-front costs were higher than initially estimated,
net savings have not been realized as quickly as expected. In addition, DOD does not have
adequate cost accounting systems to track the cost of its operations, either before or
after the base closures. Additionally, accounting systems track expenditures, not savings.
Consequently, DOD has not had an effective means of tracking changes that occur over time
affecting initial savings estimates. As a result, questions remain about the preciseness
of DOD's BRAC savings estimates. On a number of occasions, we have cited the need for DOD
to improve its financial management systems and the process it uses to track and update
BRAC savings estimates. The DRI report also indicated that DOD planned to use the A-76
process to compete approximately 150,000 full-time equivalents over the next 5 years and
projects that it can save about $6 billion over those 5 years and $2.5 billion each year
thereafter. The DRI report notes, however, that only a portion of DOD's total personnel
are in positions currently classified as commercial activities subject to A-76
competition. Consequently, DOD plans to complete a review of all its commercial activities
by November 30, 1998, to determine which are inherently governmental and must be performed
by government employees and which are commercial in nature and can be competed. It expects
that this review will identify more positions that can be competed under the A-76 process.
Overall, we believe that A-76 competitions can be cost-effective. Data indicate that
savings can occur, regardless of whether the competitions are won by the government or the
private sector. We have raised questions, however, about whether the savings will be as
great or if they will materialize as quickly as DOD projects. If they do not, two things
could happen. Either money will have to be deferred from other parts of the defense budget
to pay for shortfalls in operations and maintenance accounts or support functions will be
underfunded. If the latter occurs, operating units and field commanders will have less
money to pay for their readiness needs (e.g., aircraft and weapon system maintenance,
training, flying hours), potentially resulting in a military force that is less prepared
or ready to meet its mission requirements.
As already noted, DOD does not have an adequate cost accounting system to track the costs
of its operations. This affects its ability to fully identify savings from A-76
competitions. DOD is working toward developing accounting systems that meet the federal
cost accounting concepts and standards issued by the Federal Accounting Standards Advisory
Board. They became effective on October 1, 1997. As we recently reported, however, it will
likely be many years before these systems are in place and can provide the type of
information DOD needs to estimate costs for A-76 purposes. In addition, DOD is working to
improve the commercial activities management information system (CAMIS), which it uses to
track the status and results of ongoing and completed A-76 studies. Each military service
currently has a different version of this system, and the data each collects vary in
content and are often incomplete and inaccurate. Specifically, DOD has formed a CAMIS
working group to develop a minimum set of standard data elements that would be common to
each service's system. Until this initiative is completed and greater efforts are made to
enter complete and accurate information into the system, DOD's information on A-76 results
will be limited in its reliability.
Out-Year Budgets Do Not Target Savings from Most Reengineering Initiatives
The DRI report does not identify specific saving goals associated with the business
process reengineering initiatives and DOD has not targeted any related savings for out-
year budget reductions. According to DOD's senior managers, these initiatives will
certainly result in savings but that is not their primary benefit to DOD. Rather, they are
being counted on to improve the quality of service provided to the warfighters and other
defense business customers and to meet personnel reduction targets that have already been
planned. While we do not support making budget reductions in anticipation of savings, we
do believe establishing savings goals could be a useful tool for tracking progress.
In past reform initiatives, DOD took the savings from future year budgets. However, this
approach caused funding shortfalls when the estimated out-year savings were not achieved.
For example, in the Corporate Information Management (CIM) initiative, DOD had started a
number of reengineering initiatives that showed a great deal of promise. However, it
redirected CIM to focus on system standardization efforts in each of its business areas.
It did this primarily to achieve savings more quickly so it could offset the reductions
that had already been taken from the budget. As we have reported, this change not only
postponed the dramatic gains that could have been achieved through reengineering but also
contributed to the failure of the CIM program.
Another good reason for avoiding budget reductions before savings are more clearly known
is that DOD has probably already reduced its budget in anticipation of savings from the
reengineering initiatives. While they are hard to track in DOD over time, many of the
reengineering projects identified in the DRI report are likely outgrowths of previous
reform efforts like DMR. DMR, for example, included 250 separate decisions to implement
consolidations, improve information systems, enhance management, and employ better
business practices. These decisions were expected to yield anywhere from $62 billion to
$71 billion in savings over a 5-year period and DOD's budget was reduced up-front to
capture these savings. In reviewing these savings estimates, we found they were not always
based on cost analyses supported by historical facts or empirical cost data. During a 1993
review of the DMR, we also found it difficult to validate and track savings to specific
initiatives.
In addition, many reengineering or process improvement projects were done under the CIM
umbrella. As an outgrowth of DMR, CIM was initially expected to yield $36 billion of the
DMR savings. Reducing the budget once again for expected savings from these type of
initiatives could, in effect, result in double counting.
REENGINEERING INITIATIVES SHOW PROMISE, BUT IMPLEMENTATION CHALLENGES REMAIN
We have either completed or have ongoing work associated with several of the reengineering
initiatives in the DRI report. Overall, we are encouraged that DOD has embraced the
concept of reengineering to streamline its business practices and processes and believe
many of the initiatives have promise. However, these initiatives, most of which have been
ongoing for some time, still face implementation challenges. DOD's travel reengineering
and prime vendor programs are both good examples of areas where significant progress has
been made but opportunities still exist if organizational and cultural barriers can be
overcome.
Travel Reengineering--Strong Potential for Significant Process Improvement
DOD's travel reengineering project is comprehensive in scope. First, it involves a
complete analysis and redesign of the temporary duty travel process from the time a
traveler decides to travel until he/she is reimbursed by DOD. Second, it transcends all
organizational boundaries in that it involves a single process and system that will be
implemented DOD-wide. As we understand it, there will be no Navy, Army, or Air Force
derivative. Third, the project received high visibility and support from top DOD
management, which helped deflect institutional roadblocks and barriers. Finally, the
travel reengineering task force that DOD established took several actions to improve the
likelihood of success. These included surveying the private sector to determine the best
industry travel practices, considering the views of DOD travelers and other stakeholders
in designing the new process, establishing base line cost and performance information from
which it could measure process and cost improvements, relying on commercial off- the-shelf
software to support the new process, conducting 27 pilots to test the new approach, and
requiring potential contractors to demonstrate their proposed travel system as part of the
contracting process.
As shown in table 1, DOD expects the travel reengineering initiative to result in
significant processing improvements and cost savings. The table compares baseline
performance (the old process) with preliminary pilot test results.
Table 1: Comparison of Baseline and Reengineered Travel Processing Performance
| Performance Indicator |
Average for baseline processes |
Average for reengineered processes |
Percent reduction |
| Number of steps in the process |
40 |
21 |
48 |
| Processing time |
4.5 hours |
1.7 hours |
63 |
| Processing cost |
$131 |
$49 |
63 |
| Cycle time |
11 days |
6 days |
48 |
The pilot tests also demonstrated a 56-percent decrease in average administrative labor
costs and almost a 100-percent increase in customer satisfaction in many of the critical
indicators.
This has not been an easy process. DOD has had to overcome many internal and external
barriers, including legislative changes to simplify or eliminate certain record keeping
and travel certification procedures. The difficulty of the task is illustrated by the fact
that the reengineering initiative is in its fourth year and the new, simplified process
has still not been implemented. DOD had intended to award a contract in December 1997 for
a single travel management system for all of DOD. This has been delayed until May 1998 to
give DOD time to negotiate with each of the companies that have bid on the contract. This
will be followed by 18 additional contracts--one for each of 18 travel regions established
by DOD--to provide specific travel services to DOD travelers. Full implementation
throughout DOD is not expected until 2001.
While the results of these pilot tests appear promising, DOD still has challenges ahead.
Besides completing its contracting process, DOD must implement the new system across a
diverse set of organizations and cultures, some of which may not be supportive. It must
also establish controls and monitor implementation using a wide variety of accounting
systems and processes. Such monitoring is important so it can gauge success and look for
opportunities for further process improvements.
Additional Opportunities Exist To Expand The Prime Vendor Program
A prime vendor is a contractor that buys inventory from a variety of suppliers, stores it
in commercial warehouses, and ships it to customers when ordered, usually within
geographical areas. This reduces delivery times and eliminates the need for customers to
maintain costly warehousing and distribution systems. Since 1993, DLA, which manages most
of DOD's consumable inventory, has made progress in implementing the prime vendor program
for medical and food supplies. For example, we estimate that the program, along with DLA's
other inventory reduction efforts in the medical area, allowed DLA to save over $700
million between fiscal year 1991 and 1996. In addition, DLA believes that the program will
save it as much as $1 billion in the food supply area over the next 5 years.
The DRI goal is to use prime vendor contracts for 40 percent of all DLA sales by fiscal
year 2000. Based on our most recent analysis, however, this goal may be difficult to
obtain because DLA has not aggressively pursued the program for hardware supplies, which
account for about 97 percent of the 4 million consumable items managed by DLA. In
addition, the services have been slow to adopt the program into their operations.
Moreover, we found that the current prime vendor program for hardware items does not
streamline logistics operations to the extent we have seen in private sector programs. For
example, DLA prime vendors merely deliver hardware items to a base or installation
warehouse, where DOD personnel still order, receive, store, and distribute material to the
retail customer. In the private sector, these activities also shifted to the prime vendor.
In our January 1998 report, we recommended that the Secretary of Defense take a greater
leadership role in seeing that this program is expanded throughout DOD and fully
incorporates the type of services offered in the private sector.
The National Defense Authorization Act for Fiscal Year 1998 also directed DLA to develop
and submit to the Congress a schedule for implementing the best commercial inventory
practices, including the use of prime vendors, for all consumable items. The act further
directed that the schedule "shall provide for the implementation of such practices to
be completed not later than three years after the date of the enactment of this Act."
We plan to monitor and report on DLA's efforts to comply with this requirement.
We have recently released a report required by the act in which we reported that DOD could
also expand the application of best practices, similar to the prime vendor concept, to the
management of reparable parts currently reported to be valued at more than $49 billion.
This would have to be done, however, within the existing legislative framework and
regulatory requirements relating to defense logistics activities, such as OMB Circular
A-76.
Total Asset Visibility Continues to Experience Delays
Since the 1970s, DOD has recognized that it needs better visibility over
its inventory. This problem became more visible when DOD was unable to identify the
contents of roughly half of the 40,000 containers it shipped to support Operations Desert
Shield and Desert Storm. However, questions about achieving total asset visibility (TAV)
still remain.
The DRI initiative relating to TAV is intended to provide the capability necessary to
support just-in-time logistics and improve inventory management. Like many of the
initiatives included in the DRI report, TAV is not new. Rather, DOD's latest effort in
this area was conceptualized in an implementation plan developed during 1994 and 1995 and
signed by the Under Secretary of Defense for Acquisition and Technology in May 1996. The
objective of TAV is to provide users with timely and accurate information on the location,
movement, status, and identity of units, personnel, equipment, and supplies worldwide. It
will depend on several large, complex information technology initiatives (such as Joint
TAV, Army TAV, Navy TAV, the Global Transportation Network, and automated identification
technology) and component logistics information systems.
The TAV initiative can be an important enabler for reducing DOD inventory requirements.
However, full implementation of TAV has been a moving target for DOD since the early
1970s, and it continues to face critical challenges. Our ongoing work focuses on whether
DOD is structuring TAV to improve known inventory problems, such as reducing excess
inventory, enhancing inventory management practices, and improving data quality and
timeliness. We are also assessing how well the military services are supporting TAV
implementation and whether DOD has adequate performance measures to determine if it will
improve inventory management.
Although total costs have not been finalized, we have been able to identify funding needs
exceeding $600 million for TAV and its supporting initiatives. However, this amount does
not include all necessary programs or support/equipment. We have also noted that the TAV
implementation date has slipped considerably, from 1995 to, according to an official in
the office of the Deputy Under Secretary of Defense (Logistics), 2004. We plan to report
on this initiative later this year.
In related work, we recently issued two reports that identified inaccuracies in key
systems the Army and the Air Force use to maintain visibility over their major equipment
assets, including their most critical war fighting equipment. We made a number of
recommendations in these reports aimed at addressing the causes of the inaccuracies and
improving DOD's ability to manage and oversee its assets from both a financial management
and readiness perspective.
Challenges Remain for Reengineering the Movement of Household Goods
DOD has long been concerned about the quality of its program to transport, store, and
manage household goods. According to the DRI report, DOD paid about $2.8 billion in fiscal
year 1997 to move almost 800,000 military families. Yet, its system gives its personnel
some of the worst service in the nation. The report stated, for example, that of all DOD
moves, 25 percent end up with damage claims, compared to 10 percent in the private sector.
Also, best-in-class movers have customer satisfaction rates of 75 percent, while DOD's is
23 percent.
Because of these and other problems, DOD proposed several years ago to reengineer its
personal property program, primarily as a quality-of-life initiative. Its primary goals
were to substantially improve the quality its military personnel and their families
received from DOD's contracted movers; simplify the total process--from arranging the
moves to settling the claims; and base the program on business processes characteristic of
world-class customers and suppliers.
In a November 1996 report, we assessed two competing reengineering proposals, one
developed by DOD and the other by a transportation industry working group. Because the
Congress was concerned that the reengineering initiative would have a negative impact on
the moving industry, particularly small businesses, it directed DOD to work with an
industry working group to develop a mutually agreeable program to pilot test the
reengineering proposal. Because these two groups could not agree on an approach to the
pilot project, each presented a separate proposal. During our work, we found that both
proposals would likely accomplish the reengineering goals but that DOD's would likely
achieve those goals to a greater extent.
Currently, the pilot project, which is being planned by the Military Traffic Management
Command, is on hold pending completion of a bid protest. Another related pilot project is
also being conducted by the Army at Hunter Army Airfield, Georgia. We are monitoring DOD's
progress on both of these pilot efforts.
Electronic Commerce and Paperless Communications--Much Work Remains To Be Done
According to the DRI report, DOD is looking to electronic commerce to drastically reduce
the amount of paper it produces, receives, processes, and stores and to bring much needed
efficiencies to its business practices. Electronic commerce embraces many technologies,
including electronic data interchange, electronic mail, computer bulletin boards, and
electronic funds transfer. The DRI report states that, by January 1, 2000, all aspects of
the contracting process for major weapon systems will be paper-free.
To achieve this goal and maximize its potential, much work must be done. As the DRI report
points out, few aspects of current business practices and systems used by DOD are
integrated. Overall, DOD has 150 accounting systems, 76 procurement writing systems,
numerous logistics systems, and one major contract administration and payment system, all
of which process contract data. Generally, these systems pass data to one another through
paper processes rather than electronically. To address this condition, business practices,
supporting processes and systems, and electronic linkages need to be examined. These
include practices and processes for such functions as determining requirements, preparing
requisitions and solicitations, writing contracts, accepting delivery of goods and
services, tracking inventory, processing invoices, disbursing funds, and posting
transactions to accounting records as well as determining how and what data will be
electronically shared. This will not be an easy task.
|
The DRI electronic commerce and paperless communication initiatives involve a number of
ongoing projects. Some of these projects began as acquisition reform measures, others were
initiated to improve financial management operations and problem disbursements, and others
were initiated to simply take advantage of existing and emerging technologies to improve
operational efficiencies and save money. (See app. I for a brief description of the
electronic and paperless programs included in this initiative.) The DRI report does not
explain the relationships among these initiatives nor does it attempt to quantify the
costs and benefits of the initiatives.
Meeting the DRI goal of paper-free processing by the year 2000 will be a challenge, given
DOD's inability to bring radical change to its processes in the past and the fact that
many of the paperless communication efforts are not scheduled to be completed until after
2000. Efforts could be further complicated because each military service and defense
agency typically changed only the processes and systems it controlled. Often, this
approach eliminated the potential to significantly improve a process that cuts across
several agencies. To address these types of issues and to centralize the management of
DOD's electronic commerce initiatives, DOD recently created the Joint Electronic Commerce
Program Office. This Office will be managed and staffed with DLA and Defense Information
Systems Agency (DISA) personnel.
MILITARY SERVICES AND DEFENSE AGENCIES NEED TO CAPITALIZE ON CONSOLIDATION AND
REGIONALIZATION OPPORTUNITIES
The DRI report includes several military service and support agency consolidation,
restructuring, and regionalization initiatives that are intended to make DOD activities
more efficient and support DOD's planned personnel reductions. Overall, we support these
initiatives but, based on our past and ongoing work, believe their potential has not yet
been realized. As with the reengineering initiatives, most of these initiatives have been
going on for several years but still face implementation challenges.
Future Plans to Address Excess Capacity in Research, Development, Test, and Evaluation
(RDT&E) Laboratories Are Unclear
Each of the military services operate (1) research and development laboratories to develop
new or enhance existing military technology and (2) test and evaluation centers to
demonstrate and validate the capabilities of these technologies. DOD's RDT&E
facilities employ about 100,000 people in 67 federally owned facilities located primarily
in the continental United States. For fiscal year 1997, the DOD budget for these
laboratories totaled just over $37 billion.
Our most recent work, completed in January 1998, pointed out that DOD's RDT&E
infrastructure continues to have excess capacity--an estimated 35 percent in its
laboratories and an estimated 52 percent in its test and evaluation centers in the air
vehicles, electronic combat, and armaments/weapons areas. This condition exists even
though DOD will have reduced funding, personnel, and force structure and closed 62
RDT&E sites and activities at host sites as part of the previous BRAC process.
The focus of our recent work was primarily on how best practices might be used to reduce
excess RDT&E capacity in DOD, the Department of Energy (DOE), and the National
Aeronautics and Space Administration (NASA). These agencies represent about 72 percent of
all federal investment in research and development and own most of the RDT&E
infrastructure. During this work, we identified five critical elements that led to the
successful downsizing of unneeded laboratory infrastructure at the Boeing Company's
Information, Space, & Defense Systems Group and the Defence Research Agency within the
British Ministry of Defence. These elements were: (1) a "crisis" that served as
a catalyst to spark action; (2) an independent authority to overcome parochialism and
political pressures that, if left unchallenged, would have impeded decision-making; (3)
core RDT&E missions focused to support the organization's overall goals and
strategies; (4) the infrastructure needed to support the overall goals and strategies
clearly defined; and (5) accurate, reliable, and comparable data that captured total
infrastructure cost and utilization rates for each RDT&E activity. According to
officials managing these restructurings, their success depended on using all five of the
elements together.
Our report also discusses the actions that DOD has taken to address its excess RDT&E
infrastructure. For example, after full implementation of previous BRAC recommendations,
DOD and the Congress realized that the RDT&E infrastructure was still too large.
Consequently, the National Defense Authorization Act for Fiscal Year 1996 (sec. 277),
directed the Secretary of Defense to develop a 5-year plan to consolidate and restructure
DOD's RDT&E facilities for the 21st century. The Secretary was to identify the
administrative and legislative actions needed to consolidate RDT&E facilities into as
few as practical and possible by October 1, 2005. The Secretary responded with a plan and
developed a legislative package entitled Defense Research, Development, Test, and
Evaluation, Vision 21, Reduction, Restructuring, and Revitalization Act of 1997 (commonly
referred to as Vision 21). However, while the legislative package was being reviewed for
interagency coordination, officials from the Office of Management and Budget told DOD to
include a provision for an independent commission, since DOD has historically been unable
to reduce significantly its RDT&E infrastructure. This commission--similar to previous
BRAC commissions--would make the final realignment and closure recommendations to the
Congress.
After the QDR was completed in May 1997, DOD decided not to submit the Vision 21
legislative package to the Congress, opting instead to include RDT&E infrastructure
consolidations and reductions in any future BRAC rounds. DOD also emphasized that
significant reductions could only be achieved under a BRAC-like authority.
With Vision 21 on hold and future BRAC legislation uncertain, it is unclear at this time
to what extent DOD will attempt to consolidate and restructure its RDT&E
infrastructure and how it might proceed. The DRI report briefly discusses the RDT&E
issue but provides no further information on how DOD will deal with infrastructure
reduction. It states that each military department will review its RDT&E facilities to
identify restructuring opportunities. As we stated in our report, we believe the extent to
which DOD's Vision 21 effort proceeds may be largely dependent on continuing congressional
support for reductions. Moreover, DOD agreed with our conclusion that an independent
BRAC-like authority, such as that provided by the Vision 21 legislative package, is needed
to reduce DOD's RDT&E infrastructure.
Navy Regional Maintenance Program May Not Meet Its Goals
For fiscal year 1996, the Navy applied more than $8.5 billion of its resources to
maintenance programs in support of fleet ships and aircraft. In response to force
structure reductions since the 1980s and subsequent defense planning guidance to reduce
excess maintenance infrastructure, the Chief of Naval Operations, early in 1993, tasked
the commanders of the Atlantic and Pacific Fleets to develop a strategy for streamlining
and consolidating their ship and aircraft maintenance functions. This led to the Navy
establishing the Regional Maintenance (RM) program in March 1994. In addition to reducing
infrastructure and saving money, the RM program is designed to improve maintenance
processes, integrate supply support and maintenance functions, and provide compatible data
systems for the different maintenance functions. The program was to be implemented in
three overlapping phases during fiscal years 1995-99 and was expected to save substantial
amounts of money. In its 1995 program review, for example, the Navy decreased its planned
operations and maintenance budgets for fiscal years 1995-99 by about $1.28 billion in
anticipation of such savings.
As of November 1997, the Navy had focused its efforts on establishing a management
structure and process for realigning and reducing its maintenance infrastructure at eight
Navy regions. It has also developed RM business plans, including initiatives and estimates
of savings to be achieved. These estimates predict that the Navy will save about $944
million for 102 projects to be implemented between fiscal years 1994-2001.
In a recent report on the RM program, we reported that the Navy had made substantial
progress in establishing a structured RM Program but savings had not materialized as
anticipated. Further, the accuracy of savings that had been claimed by the Navy were
questionable because they are not tracked and verified. Consequently, the Navy's actual
savings may be far less than $944 million and may not be achieved as soon as expected.
Because reductions had already been made to spending plans in anticipation of these
savings, we reported that maintenance programs, the overall material readiness of ships
and aircraft, or future fleet readiness could be negatively affected. For example, Navy
officials told us they have thus far been able to absorb the reductions with no impact on
readiness by fixing specific problems rather than performing scheduled depot-level
overhauls. They were concerned, however, that this approach might adversely affect the
condition of ships over the long term.
Nevertheless, we reported that the Navy could still achieve significant savings by moving
more quickly to implement the savings initiatives that had been identified and, where
appropriate, implement other initiatives that could yield savings without affecting
readiness. To do this, however, the Navy had to overcome parochial and institutional
resistance to the RM program's objectives. These include resistance to efforts that might
eliminate organizations, reduce jobs, and/or reduce a command's or an organization's
control over resources. Other barriers that also had to be addressed were (1) the lack of
management visibility over all maintenance-related costs; (2) multiple, unconnected
management information systems that do not provide adequate data for regional maintenance
planning and decision-making; and (3) significant differences in the number of shore duty
intermediate-level maintenance positions needed to support the Navy's sea- to-shore
rotation program and the number of personnel needed to perform the work. Although the Navy
has established RM Program working groups and committees to address these issues,
continued high-level commitment, cooperation, and coordination from the Chief of Naval
Operations, the fleet, and type and systems commanders will be required to ensure that
regional initiatives reach fruition and achieve the savings projected.
The Finance and Accounting Infrastructure--Potential for Further Reductions
The Defense Finance and Accounting Service (DFAS) was established in 1991 to consolidate
and streamline DOD's finance and accounting operations. In May 1994, after several false
starts, DOD announced that DFAS would begin consolidating the finance and accounting
infrastructure in fiscal year 1995. At that time, the plan was to reduce the number of
sites where finance and accounting activities were conducted from over 330 to 26. The 26
sites included the five existing large finance centers (Columbus, Cleveland, Denver,
Indianapolis, and Kansas City) and 21 new sites called operating locations. As part of
this consolidation, DFAS expected to reduce its staffing levels from about 27,000 to
23,000 people. As of September 30, 1997, DFAS told us it had reduced staffing to about
21,900 people and opened 18 of the planned 21 operating locations.
We have issued several reports that questioned the need for 21 operating locations. Our
primary concern was that DOD used a flawed process to identify the size and location of
its consolidated operations. Among other things, we reported that the planned
infrastructure was larger than necessary, primarily because DOD had not considered the
impact that future business improvements would have on the finance and accounting
workload. As these business improvements are adopted, we argued that DFAS will have to
consolidate its activities once again. We also pointed out that an earlier DFAS analysis
had concluded that the existing five finance centers and six operating locations was the
optimum structure for conducting finance and accounting operations.
A recent DFAS analysis has concluded that the finance and accounting infrastructure does,
in fact, need to be further consolidated. This analysis, which assessed each finance and
accounting function carried out at operating locations (such as vendor pay, civilian pay,
travel pay, and accounting), showed that DFAS will be able to reduce the number of
personnel from about 21,400 in fiscal year 1998 to about 15,350 by the end of fiscal year
2003. These reductions would be realized, in part, by technology initiatives underway at
DFAS and, if they occur, would leave DFAS with about 38 percent excess facility capacity.
The analysis did not translate this excess capacity into a specific number of locations
that should be eliminated. Nevertheless, the DRI report stated that DFAS would continue
its consolidation initiatives by eliminating 8 of its 26 finance and accounting
facilities. DFAS is currently developing criteria to help it determine which locations
should be eliminated. Once these criteria are approved, which is expected by May 1998,
DFAS plans to take from 3 to 6 months to further study its infrastructure needs and select
the sites that will be closed. At this point, DFAS does not expect to close more than
eight facilities.
Defense Information Systems Agency--Status of Consolidating Its Megacenters
The DRI report calls for the Defense Information Systems Agency (DISA) to reduce its
infrastructure from 16 to 6 large processing facilities. This initiative is a continuation
of DOD efforts that began in 1990. Since that time, DISA was created and eventually
consolidated many of DOD's computer operations by moving workload and equipment from 194
computer centers to 16 DISA megacenters. These actions were taken to better meet DOD's
information processing needs at lower costs. The DISA megacenters operate as part of the
defense working capital fund and bill their customers for the processing support they
provide. We should note, Mr. Chairman, that the military services and defense agencies
also operate many processing centers and, like DISA, have also consolidated some of their
information processing facilities.
Our previous work on information processing center consolidations pointed out that
although DOD had recognized the need to continue to reduce the cost of its computer center
operations, it had not established an effective framework for making these decisions. Such
a framework would help DOD determine the number of processing centers needed, the way to
consolidate the various computer operations, and the numbers and skill mix of staff needed
to operate the consolidated centers. We believed this framework or plan was needed because
our work documented that, although additional efficiencies could be realized, it was not
clear whether these would be best achieved by further consolidations or outsourcing. DOD
partially agreed with our point, stating that it would comply with the Clinger-Cohen Act
and develop a framework to determine whether processing centers should remain in-house or
be considered for outsourcing studies.
The Defense Megacenter Business Strategy, dated October 1997, states that DISA's plan to
reduce the 16 megacenters to 6 could result in annual savings of $202 million starting in
fiscal year 2003. Moreover, the strategy estimates that total savings over a 10-year
period (fiscal year 1998 through 2007) will be approximately $1.5 billion. We have not
done any work to examine this strategy or substantiate these savings. If these savings
occur, however, they should help DISA reduce its infrastructure costs and, thereby, result
in lower prices to its customers. At your request Mr. Chairman, we are reviewing how DISA
establishes the prices it charges its customers. In the future, we intend to review the
cost of the consolidation effort and the impact it is having on customer service.
IMPLEMENTING DRI REQUIRES DOD TO ADDRESS THE UNDERLYING CAUSES OF ITS MANAGEMENT PROBLEMS
As we have reviewed DOD programs and management initiatives over the years, we have made
hundreds of recommendations to help DOD correct its problems. To its credit, DOD has taken
actions to address many of these recommendations and has made some progress in
implementing change throughout all areas of the Department. For example, in response to
our recommendations, DOD implemented certain commercial practices in its inventory
management area, such as relying on prime vendors to provide defense customers with
medical and food items. However, even though this and other actions are very important,
DOD has not yet addressed many of the underlying causes that have previously kept it from
effectively implementing management reforms across the department. We identified these
causes in our 1997 High-Risk Series Reports Involving DOD, and I would like to discuss
them here because I think they are applicable to the long-term success of the DRIs. These
underlying causes include the following:
-- Cultural barriers and parochialism limit opportunities for change. Cultural resistance
to change and service parochialism have contributed to the difficulty of implementing
corrective actions to improve DOD's financial, infrastructure, inventory, and acquisition
systems. Particularly problematic are corrective actions that require the development and
use of common systems and processes across military service and organizational boundaries.
Each of the services, for example, has its own way of doing business, its own budget and
programmatic authority, and its own parochial interests in maintaining the status quo.
Even if there is common agreement among the leadership of the department, management
reform initiatives that involve up-front investments, the closure of installations, and
the elimination of military and civilian jobs sometimes are not fully implemented unless
they have wide-spread support throughout the services and defense agencies.
-- Incentives for seeking and implementing change are lacking. DOD managers have few
incentives to improve DOD's financial, acquisition, and infrastructure management
approaches. For example, in DOD's culture, the success of a manager's career depends more
often on moving programs and operations through the DOD process rather than on improving
the process. We found this particularly evident in large weapon acquisition and
information system development programs where overselling resulted in programs being
started, funded, and eventually fielded. The fact that a given program costs more than
estimated, takes longer to complete, and does not generate results or perform as promised
is secondary to implementing the program.
-- Management data are deficient. DOD decisionmakers are severely affected by the lack of
comprehensive and reliable data for measuring program costs and results and making
well-informed decisions. DOD, for example, has acknowledged fundamental problems with its
ability to accumulate reliable cost data. DOD does not have accurate cost data for almost
all its assets, such as inventories, equipment, aircraft, and missiles. In addition, DOD
cannot accumulate reliable information on its business activities' costs or its critical
operations, such as the cost associated with maintaining its weapons systems in a high
state of readiness, or costs related to its contingency operations. This will to be a
serious problem in implementing any of the DRI reform initiatives because DOD will lack
the data it needs to estimate baseline costs and track project implementation.
-- Clear, results-oriented goals and performance measures are lacking in some cases. DOD's
strategic goals and objectives are not always linked to those of the military services and
defense agencies, and DOD's guidance tends to lack specificity. Without this type of
clear, hierarchically linked goals and performance measures, DOD managers lack
straightforward road maps showing how their work contributes to attaining DOD's strategic
goals. This increases the risk that these managers will operate autonomously rather than
collectively. This is important in the DRI environment because each of the military
services and defense agencies must assume part of the responsibility for meeting DOD's
infrastructure and personnel reduction targets. They must also be responsible for
monitoring the impacts of the reductions in terms of readiness and the ability to meet
their fundamental mission requirements. Without these type of performance measures and
goals, it is possible that personnel reductions and reduced operations and maintenance
budgets will have either positive or negative impacts that are never fully understood.
-- Management accountability and follow through have been inconsistent. Even when DOD
develops organization goals and performance measures, it does not routinely link them to
specific organizational units or individuals that have sufficient flexibility, discretion,
and authority to accomplish the desired results. These linkages are important to fix
accountability at both the organizational and managerial levels. Such accountability is
particularly important at DOD because our past work and experience have shown that the
DOD's top managers do not have a proactive, consistent, and continuing role in building
capacity, creating incentives, and integrating daily operations. In 1994, for example, we
reported that the median tenure of top political appointees in the Office of the Secretary
of Defense was 1.7 years. We also found that mean vacancy periods for top positions in the
Departments of the Air Force and the Navy were 9 and 11 months, respectively. As a result,
turnover among DOD political appointees has hindered long-term planning and follow-through
activities.
Implementation Plans Are Needed
To attack these underlying causes, DOD needs to ensure that its implementation plans at
all organizational levels establish results-oriented goals, performance measures, and time
frames for completing corrective actions; identify organizations and individuals that are
responsible for accomplishing specific goals; and provide sufficient information for the
Defense Management Council to monitor progress. In developing these implementation plans,
DOD should comply with the legislative requirements of the Chief Financial Officers Act,
the Government Performance and Results Act, the Paperwork Reduction Act, and the
Clinger-Cohen Act. These acts provide important criteria for ensuring that DOD and other
agencies focus their resources on the highest priority programs and develop sufficient
management and financial information to know whether the programs are meeting their
objectives.
Mr. Chairman, in closing let me reiterate my strong support for the Secretary's reform
initiatives. Concerns that I have raised are based on our experience in examining some of
the areas undergoing reform. My intent is to indicate that too much should not be expected
too soon. This is particularly the case as it relates to the historical pattern of
claiming savings or reducing personnel levels prematurely in advance of such savings being
actually achieved. Consequently, it will be important for the department to carefully
track implementation of these initiatives and make resource and other management decisions
as necessary to avoid unintended adverse impacts on support and readiness activities.
Electronic Commerce and Paperless Communications Initiatives
The Defense Reform Initiatives (DRI) report states that, by January 1, 2000, all aspects
of the contracting process for major weapon systems will be paper-free. Electronic
commerce, however, is not new. In October 1993, a presidential memorandum established a
government-wide goal of streamlining acquisition through the use of electronic commerce.
Ninety-five percent of all government purchases under $100,000 are expected to be made
through electronic commerce by the year 2000.
The following initiatives, which are described in our recent report, can help DOD reduce
the amount of paper used in procurement and contract payment processes. It is not clear
from the DRI report, however, how these initiatives will collectively eliminate the paper
that is passed among the many DOD systems and it is not clear if, and to what extent,
savings and productivity will be realized.
ELECTRONIC DOCUMENT MANAGEMENT (EDM)
EDM is a technology initiative intended to convert paper copies of DOD contract payment
documents to electronic images at the Defense Finance and Accounting Service (DFAS)
Columbus Center. All paper documents received by the Center, such as contracts, invoices
and receiving reports, will be scanned and converted to electronic images-- similar to
photographs--and stored in an EDM database at the Center. Once stored, these images can be
retrieved and viewed by Center personnel. While the EDM program will help eliminate the
need to handle paper documents after they are received and scanned, it will not reduce the
amount of paper being sent to Columbus. Moreover, they cannot be electronically input into
other systems. Center personnel must still manually enter the contract data into other
systems such as contract payment and accounting systems. EDM is being developed under a
5-year contract awarded in September 1994. The program is expected to be completed by the
end of fiscal year 1999. While the contract covers EDM applications for other DOD
functions, the contract pay portion is expected to cost $33 million.
ELECTRONIC DOCUMENT ACCESS (EDA)
EDA provides DOD users with electronic images of contracts, contract modifications, and
related documents. Electronic document files created by the DOD acquisition community are
stored in an EDA data base. Once stored, these documents can be accessed and viewed on
DOD's computer network, the Non-Classified Interactive Processor Router Network (NIPRNET).
The expanded use of EDA is expected to significantly reduce the amount of time DOD spends
mailing and distributing paper documents and eliminate document loss and mailing delays.
The initiative began in April 1996, and it is scheduled for completion in December 1998.
EDA, which is being funded by the EDM initiative, is expected to cost about $2.7 million.
As of December 1997, over 100,000 contracts were available in the EDA database. EDA will
not eliminate all paper documents needed in the contract payment process. Documents such
as receiving reports and invoices are not included in the EDA database and will have to be
made available electronically by other initiatives. In addition, as with EDM, Center
personnel must still manually enter contract data from the electronic images into contract
payment and accounting systems.
ELECTRONIC DATA INTERCHANGE (EDI)
EDI allows the computer-to-computer exchange of routine business information by requiring
standardized data formats. The military services and the Defense Logistics Agency (DLA)
are using EDI to support their procurement processes. They have about 76 nonstandard
procurement systems generating contractual documents and have begun working with nine of
the largest systems to provide the capability to convert and transmit their data in EDI
formats. Likewise, DFAS is using EDI to support its procurement and payment processes. For
EDI to work effectively, however, all of these systems must be able to electronically
exchange data and ensure that the data conform to standard data formats for documents such
as contracts, contract modifications, and invoices. As of September 30, 1997, about 80 DOD
contractors were approved to use EDI to transmit invoices to DOD's primary contract
payment system. However, only about 50 contractors were actually transmitting invoices
using EDI. We do not have complete costs for the EDI initiative. However, we have
documented that DFAS alone plans to spend $47.1 million to develop and implement EDI for
its operations between fiscal year 1995 and 1999.
STANDARD PROCUREMENT SYSTEM (SPS)
SPS will be an automated procurement information system for preparing procurement
contracts and supporting contract administration. As planned, it will replace DOD's manual
procurement systems and the 76 unique automated procurement systems that are used to
prepare contracts. SPS is also expected to standardize procurement business practices and
data elements throughout DOD and provide users timely, accurate and integrated contract
information. SPS will use EDI capability to share data with other systems. As part of the
SPS design, contract and contract payment data will be entered once--at the source of the
information--and will be stored in a "shared data warehouse." The SPS initiative
began in January 1994. It is being managed by DLA. Initial SPS implementation began in May
1997. SPS development and implementation are expected to be completed by September 30,
2001, at a cost of about $295 million.
DEFENSE PROCUREMENT PAYMENT SYSTEM (DPPS)
DPPS is intended to be a single standard DOD system for calculating contract payments and
posting the payment information to accounting records. This system, along with SPS, is to
replace the current contract payment system--Mechanization of Contract Administration
Services (MOCAS). DPPS is expected to (1) provide a single system which DFAS can use to
validate funds availability, (2) reduce DFAS' reliance on hard copy documents, and (3)
eliminate cumbersome manual processes for reconciling contract, payment, and accounting
records. Like SPS, DPPS will use EDI capability to share data with other systems. The DPPS
initiative began in September 1995. It is being managed by DFAS and is estimated to cost
$114 million. DPPS implementation is scheduled to be completed by April 15, 2002.
ELECTRONIC MALLS
Simply stated, electronic malls are electronic versions of suppliers' catalogs that are
available through the internet. These malls will eventually allow DOD customers to access
a variety of electronic ordering systems or "stores". The stores usually
specialize in commodity groups such as industrial products, office supply products, food,
or textiles. DLA and each military service are developing an electronic mall for the
inventory items they manage. DOD plans for users to eventually be able to move among the
various electronic malls with relative ease. This capability does not yet exist. By April
1998, DLA's electronic mall is expected to offer more than 4 million items DLA manages as
well as several hundred thousand commercial items in vendor catalogs to DOD customers.
DLA's electronic mall is expected to provide the following information: descriptions of
the products, weapon systems supported, types of payments accepted, ordering procedures,
contractors' names, and contract numbers. According to DLA, electronic malls blend the
benefits offered by the internet, government purchase cards, and the prime vendor program.
This includes easy access, easy purchasing procedures, and readily available items at
competitive prices.
GOVERNMENT PURCHASE CARD
A government purchase card is essentially a credit card for small procurements (generally
micropurchases under $2,500) that allows the government to cut the red tape normally
associated with the procurement process. Using the card, for example, generally eliminates
the need for procurement requests, receiving reports, and invoices. It also reduces the
number of disbursements because a single payment is made to the card company rather than
to each vendor. In fiscal year 1997, DOD's purchases using the card totaled $321 million.
This total involved about 567,000 transactions by about 115,000 card holders. The Army is
leading other DOD components in use of the card. During fiscal year 1997, it made about
257,000 transactions totaling $147 million, which was about 45 percent and 46 percent of
DOD totals, respectively. Increased use of the purchase card by the military services and
defense agencies has the potential to reduce both workloads and staffing levels. The Army
estimated that use of the card would reduce the cost of a typical procurement action from
about $130 to about $30. Likewise, use of the card will reduce DFAS' vendor pay workload
and staffing.
Until recently, only one type of purchase card was available to DOD components--the
International Merchants Purchase Authorization Card (IMPAC)--a visa credit card. In
February, however, the General Services Administration awarded contracts to six credit
card companies to provide credit cards to government agencies. DOD, like other federal
agencies, will be able to negotiate with the contractors for the types of cards and
services they want. In addition, under the contracts, DOD can negotiate special
incentives, such as rebates.
Related GAO Products
Base Operations: DOD's Use of Single Contracts for Multiple Support Services
(GAO/NSIAD-98-82, Feb. 27, 1998).
Defense Outsourcing: Better Data Needed to Support Overhead Rates for A-76 Studies
(GAO/NSIAD-98-62, Feb. 27, 1998).
Best Practices: Elements Critical to Successfully Reducing Unneeded RDT&E
Infrastructure (GAO/NSIAD/RCED-98-23, Jan. 8, 1998).
Future Years Defense Program: DOD's 1998 Plan Has Substantial Risk in Execution
(GAO/NSIAD-98-26 Oct. 23, 1997).
1997 Defense Reform Bill: Observations on H.R. 1778 (GAO/T-NSIAD-97-187, June 17, 1997).
Defense Infrastructure: Demolition of Unneeded Buildings Can Help Avoid Operating Costs
(GAO/NSIAD-97-125, May 13, 1997).
DOD High-Risk Areas: Eliminating Underlying Causes will Avoid Billions of Dollars in Waste
(GAO/T-NSIAD/AIMD-97-143, May 1, 1997).
Defense Acquisition Organizations: Linking Workforce Reductions With Better Program
Outcomes (GAO/T-NSIAD-97-140, Apr. 8, 1997).
Defense Budget: Observations on Infrastructure Activities (GAO/NSIAD-97-127BR, Apr. 4,
1997).
Defense Outsourcing: Challenges Facing DOD as It Attempts to Save Billions in
Infrastructure Costs (GAO/T-NSIAD-97-110, Mar. 12, 1997).
Base Operations: Challenges Confronting DOD as It Renews Emphasis on Outsourcing
(GAO/NSIAD-97-86, Mar. 11, 1997).
Defense Logistics: Much of the Inventory Exceeds Current Needs (GAO/NSIAD-97-71, Feb. 28,
1997).
Military Bases: Cost to Maintain Inactive Ammunition Plants and Closed Bases Could Be
Reduced (GAO/NSIAD-97-56, Feb. 20, 1997).
High-Risk Series: Defense Financial Management (GAO/HR-97-3, Feb. 1997).
High-Risk Series: Contract Management (GAO/HR-97-4, Feb. 1997).
High-Risk Series: Defense Inventory Management (GAO/HR-97-5, Feb. 1997).
High-Risk Series: Defense Infrastructure (GAO/HR-97-7, Feb. 1997).
Managing Technology: Best Practices Can Improve Performance and Produce Results
(GAO/T-AIMD-97-38, Jan. 31, 1997).
Air Force Depot Maintenance: Privatization-In-Place Plans Are Costly While Excess Capacity
Exists (GAO/NSIAD-97-13, Dec. 31, 1996).
Defense IRM: Strategy Needed for Logistics Information Technology Improvement Efforts
(GAO/AIMD-97-6, Nov. 14, 1996).
Acquisition Reform: Implementation of Title V of the Federal Acquisition Streamlining Act
of 1994 (GAO/NSIAD-97-22BR, Oct. 31, 1996).
Army Depot Maintenance: Privatization Without Further Downsizing Increases Costly Excess
Capacity (GAO/NSIAD-96-201, Sept. 18, 1996).
1997 DOD Budget: Potential Reductions to Operation and Maintenance Program
(GAO/NSIAD-96-220, Sept. 18, 1996).
Defense Acquisition Infrastructure: Changes in RDT&E Laboratories and Centers
(GAO/NSIAD-96-221BR, Sept. 13, 1996).
Best Practices: Commercial Quality Assurance Practices Offer Improvements for DOD
(GAO/NSIAD-96-162, Aug. 26, 1996).
Navy Financial Management: Improved Management of Operating Materials and Supplies Could
Yield Significant Savings (GAO/AIMD-96-94, Aug. 16, 1996).
Inventory Management: Adopting Best Practices Could Enhance Navy Efforts to Achieve
Efficiencies and Savings (GAO/NSIAD-96-156, July 12, 1996).
Defense Infrastructure: Costs Projected to Increase Between 1997 and 2001
(GAO/NSIAD-96-174, May 31, 1996).
Military Bases: Opportunities for Savings in Installation Support Costs Are Being Missed
(GAO/NSIAD-96-108, Apr. 23, 1996).
Acquisition Reform: Efforts to Reduce the Cost to Manage and Oversee DOD Contracts
(GAO/NSIAD-96-106, Apr. 18, 1996).
Defense Depot Maintenance: Privatization and the Debate Over the Public-Private Mix
(GAO/T-NSIAD-96-146, Apr. 16, 1996).
Military Bases: Closure and Realignment Savings Are Significant, But Not Easily Quantified
(GAO/NSIAD-96-67, Apr. 8, 1996).
Defense Infrastructure: Budget Estimates for 1996-2001 Offer Little Savings for
Modernization (GAO/NSIAD-96-131, Apr. 4, 1996).
Managing for Results: Achieving GPRA's Objectives Require Strong Congressional Role
(GAO/T-GGD-96-79, Mar. 6, 1996).
Defense Transportation: Streamlining of the U.S. Transportation Command Is Needed
(GAO/NSIAD-96-60, Feb. 22, 1996).
Best Management Practices: Reengineering the Air Force's Logistics System Can Yield
Substantial Savings (GAO/NSIAD-96-5, Feb. 21, 1996).
Managing for Results: Critical Actions for Measuring Performance (GAO/T-GGD/AIMD-95-187,
June 20, 1995).
Financial Management: Challenges Confronting DOD's Reform Initiatives (GAO/T-AIMD-95-146,
May 23, 1995).
Military Bases: Analysis of DOD's 1995 Process and Recommendations for Closure and
Realignment (GAO/NSIAD-95-133, Apr. 14, 1995).
|